Temporary Theatre, Como, Italy
The project was designed during the first year of Master at the Accademia di Architettura di Mendrisio with professor Arch. Martin Boesch.
The solution to the request of a temporary theatre was to adopt a scaffolding system which was quick and easy to assemble and disassemble. The squared structure with an internal courtyard allows, thanks to the bleachers, to accomodate both public and orchestra. All the material used in the construction of theatre: the structure, the safety net, the wooden flooring once disassembled, will be reuse for the construction of a new building or scaffolding.
Team: Andrea Neri, Imran Mukadam
Model - Context
Plan - Como
Plan - Context
Section - Context
Model
Plan - Ground Floor
Plan - First Floor
Plan - Terrace
Plan - "Roof"
Model - Detail of the scaffolding and stair
Elevation
Section
Model - Internal Perspective
Model - Terrace Perspective
Model - Detail
Elevation - Detail
Section - Detail
Section - Detail